Daily Productivity Calculator

Last updated: 2026-08-24

Daily Productivity Calculator — Calculate daily work productivity.
Inputs
Result
Enter values and press Calculate

How to use it

  1. Determine the número of workers that work simultáneamente in the task
  2. Establish the hours efectivas of work per shift (8 h estándar, descartando pausas and preparación)
  3. Assign the efficiency per worker in m²/hour según the task: 3-5 m²/h to partitions, 1-3 m²/h to solados, 0.5-2 m²/h to enfoscados
  4. Multiply: workers × hours/día × efficiency/hour = producción daily in m²
  5. Calculate the producción weekly (×5 días) and monthly (×22 días laborables)
  6. Calculate the hours necesarias to 100 m²: 100 ÷ (workers × yield_hora)

Common mistakes

  • ⚠️ Use yields teóricos of bas is of precios without ajustar a the condition is current is of the project
  • ⚠️ Not considering the curva of aprendizaje: the first días the efficiency is lesser to alcanzar the speed óptima
  • ⚠️ Forget that the efficiency drops in height (andamios) or in espacios confinados
  • ⚠️ Not account for the time of acopio of materials, cort is and limpieza between tasks
  • ⚠️ Planning with yields of skilled worker of 1ª when the equipment includes apprentic is or laborers

Worked example

Calculate daily productivity for 8 workers.

Results: {m2_dia} m²/día, {m2_semana} m²/week, {m2_mes} m²/month, {h_por_100m2} hours per each 100 m².

Input guide

FieldTypical range
rendimiento_m2_hValue between 0.5 and 20 m²/h/op.
horas_diaValue between 4 and 10 h/día.
operariosValue between 1 and 50 workers.