Daily Productivity Calculator
Last updated: 2026-08-24
Daily Productivity Calculator — Calculate daily work productivity.
Inputs
Result
Enter values and press Calculate
Was this helpful?
How to use it
- Determine the número of workers that work simultáneamente in the task
- Establish the hours efectivas of work per shift (8 h estándar, descartando pausas and preparación)
- Assign the efficiency per worker in m²/hour según the task: 3-5 m²/h to partitions, 1-3 m²/h to solados, 0.5-2 m²/h to enfoscados
- Multiply: workers × hours/dÃa × efficiency/hour = producción daily in m²
- Calculate the producción weekly (×5 dÃas) and monthly (×22 dÃas laborables)
- Calculate the hours necesarias to 100 m²: 100 ÷ (workers × yield_hora)
Common mistakes
- ⚠️ Use yields teóricos of bas is of precios without ajustar a the condition is current is of the project
- ⚠️ Not considering the curva of aprendizaje: the first dÃas the efficiency is lesser to alcanzar the speed óptima
- ⚠️ Forget that the efficiency drops in height (andamios) or in espacios confinados
- ⚠️ Not account for the time of acopio of materials, cort is and limpieza between tasks
- ⚠️ Planning with yields of skilled worker of 1ª when the equipment includes apprentic is or laborers
Worked example
Calculate daily productivity for 8 workers.
Results: {m2_dia} m²/dÃa, {m2_semana} m²/week, {m2_mes} m²/month, {h_por_100m2} hours per each 100 m².
Input guide
| Field | Typical range |
|---|---|
| rendimiento_m2_h | Value between 0.5 and 20 m²/h/op. |
| horas_dia | Value between 4 and 10 h/dÃa. |
| operarios | Value between 1 and 50 workers. |